How Much Does a Home Renovation Cost in Indiana in 2026

Midrange bath remodels averaged $26,138 nationally in the Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com). Indiana carpenters averaged $31.22 hourly in May 2025 (U.S. $31.55; BLS). You may cancel a remodeling contract over $150 on your Indiana home before midnight of the third business day after signing (IC 24-5-11-10.6).

Bath and kitchen benchmarks from Cost vs. Value

Zonda averages 28 projects over 119 U.S. markets, cost against resale value. For the bath remodel it defines as midrange, the national job cost in 2025 was $26,138 and the resale value $20,915, an 80% recoup. The midrange minor kitchen remodel cost $28,458 and was valued at $32,141 on resale, so it recouped 113%.

Both are national averages, not Indiana prices, and the captured pages give no project scope.

© 2025 Zonda Media, a Delaware Corporation. Complete data from the Remodeling 2025 Cost vs. Value Report can be downloaded free at www.costvsvalue.com.

How Indiana carpenter pay compares

BLS wage estimates for May 2025 count 15,240 employed carpenters in Indiana. Their mean was $31.22 an hour ($64,950 annually), just under the $31.55 U.S. mean ($65,630). The Indiana median, $30.23, was higher than the national $29.12. Only wage and salary workers are sampled; the self-employed and owners and partners of unincorporated firms are not. A wage is one input to a bid.

What Indiana’s contract statute demands of a remodeler

IC 24-5-11 governs any agreement, spoken or written, priced above $150 to alter, repair, replace, reconstruct or otherwise modify residential real property in Indiana (sections 1, 3 and 4). That property means one to four units used at least partly as the consumer’s dwelling (section 7.5), and the consumer may be an owner, a lessee or a renter (section 2). Interior work is named outright, basements included (section 2.8).

You must receive the completed contract before you sign it. Section 10(a) sets its minimum contents:

  1. your name and the address of the property;
  2. the remodeler’s name, address and email and, for each person to whom problems and inquiries can be directed, a name, phone number and email;
  3. the date the contract was submitted to you and any time limit on accepting it;
  4. a reasonably detailed description of the work;
  5. if the specifications are not in that description, a statement that they will come before work starts and that the contract depends on your separate written, dated approval of them;
  6. approximate start and finish dates;
  7. any contingencies that would materially change the finish date;
  8. the contract price;
  9. whether a subcontractor, vendor or other outsider will lease or furnish labor, services, material, equipment or machinery;
  10. signature lines, each with the signer’s name printed or typed.

When insurance proceeds or a liable third party will pay, section 10(c) relaxes the description, date and price items. The remodeler has to sign first: section 11 requires its unequivocal written signature before you sign and before any down payment can be demanded. You get a fully executed, dated copy right after signing (section 12). A later change binds you only if you sign it in writing (section 10(d)). If a license or permit is needed for any part of the job, the contract must be conditioned on getting it before work begins (section 9). Section 14 makes any violation a deceptive act, actionable by you or by the attorney general under IC 24-5-0.5.

The three-business-day exit

Every contract under the chapter entered after June 30, 2017 carries a cancellation right, not just door-to-door or storm jobs. Section 10.6(c) closes that window at midnight on the third business day after whichever of two dates comes later: signing by both parties, or, if insurance is involved, the day you receive the insurer’s written final determination on coverage. Written notice goes to the address or email given in the cancellation form. Mailed notice takes effect when deposited, postage prepaid; email counts on the day it is sent.

Within ten days of a cancellation, section 10.6(d) requires the remodeler to hand back any payment or deposit and any note or other evidence of your debt. The statute’s own notice form differs: payments back within ten business days after the remodeler receives your notice, minus any amounts owed for work already done. Subsection (d) is made subject to one exception, (e): if the remodeler did emergency or temporary work that you had confirmed in writing beforehand was needed to prevent damage, it is entitled to that work’s reasonable value.

Who licenses remodelers, and which code editions apply

Indiana’s Business Owner’s Guide says “the only construction contractors licensed by the State of Indiana are plumbers” and that other trades “require local licensing which vary by city and county.” The Indiana Department of Homeland Security’s rules table lists the 2020 Indiana Residential Code (675 IAC 14-4.4, based on the 2018 International Residential Code, first printing) as currently in effect since December 26, 2019. The same table lists the 2012 Indiana Plumbing Code (675 IAC 16-1.4, based on the 2006 International Plumbing Code, second printing) as in effect since December 24, 2012.

Indiana remodeling questions

Can I look up my general contractor’s state license?

No. Indiana’s Business Owner’s Guide calls contractor licensing, other than for plumbers, a local option, so a general contractor’s license, where one exists, comes from the city or county.

The remodeler wants to start before I approve the specifications. Can he?

Not under the contract the statute requires: specifications missing from the description must be provided before any work begins, and the contract is subject to your separate written, dated approval of them. When insurance or a liable third party will pay, section 10(c)(5) lets you authorize an earlier start in writing, and you are then obligated for the work specified and, if applicable, agreed to by the insurance carrier.

Does the right to cancel cover a contract I agreed to over the phone?

Yes. The chapter reaches oral agreements over $150, and section 10.6 applies to any contract under it.

More on this: kitchen remodel budgets, bathroom remodel ranges, Indiana plumbing repair, Indiana furnace and AC installation, Indiana roof replacement, HELOC calculator.