The Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com) averages $19,484 nationally for its HVAC electrification conversion. Nebraska HVAC mechanics earned a mean $29.35 an hour in May 2025, versus $31.14 nationwide (BLS). Heating or cooling a building that had neither can make the job a Nebraska Energy Code “renovation.”

A national job-cost figure and the Nebraska installer wage

The report’s HVAC Conversion | Electrification project is the only heating-and-cooling job among its 28 projects. Across the 119 U.S. markets it samples, the job averaged $19,484, and the report estimates it adds $14,053 in resale value, which works out to 72% of the cost. What equipment that conversion replaces, and with what, is set out in the full report, not in its summary pages, so treat $19,484 as a national reference point, not a quote for your house.

For labor, the Bureau of Labor Statistics estimated 3,020 people employed in Nebraska in May 2025 as heating, air conditioning, and refrigeration mechanics and installers. The state mean was $29.35 an hour, or $61,050 a year; the median was $28.77, or $59,850. The national figures for the same occupation were a $31.14 mean and $29.33 median ($64,780 and $61,010 a year). BLS counts wage and salary workers only, so owner-operators are missing, and a wage says nothing directly about the margin, equipment and permit costs built into your quote.

When a heating or cooling job falls under the state Energy Code

Section 81-1611 adopts the 2018 International Energy Conservation Code as the Nebraska Energy Code, and section 81-1614 applies it to new buildings and to “renovations of or additions to any existing buildings” where construction started on or after July 1, 2020. Two definitions in section 81-1609 decide whether an existing house is caught:

  • Renovation: “alterations on an existing building which will cost more than fifty percent of the replacement cost of such building at the time work is commenced or which was not previously heated or cooled, for which a heating or cooling system is now proposed, except that the restoration of historical buildings shall not be included.”
  • Addition: “an extension or increase in the height, conditioned floor area, or conditioned volume of a building or structure.”

Section 81-1615 exempts six categories: buildings with a peak design energy use under one watt (3.4 Btu per hour) per square foot; buildings neither heated nor cooled; property owned by the United States; manufactured homes; modular housing units; and buildings on the state or National Register of Historic Places, designated historic under local or state law or survey, certified as contributing to a listed or designated historic district, or found eligible for the Register by the State Historic Preservation Officer or the Keeper of the National Register.

A county, city or village may adopt its own energy code instead. Section 81-1618 treats it as equivalent if it does not result in more energy use than the state code and is reasonably consistent with the statute’s intent, and lets the locality waive a specific requirement that is “not economically justified” after sending its analysis to the department. Where no local energy code exists and no architect or engineer is involved, the prime contractor must build, “to the best of his or her knowledge,” to the Nebraska Energy Code (section 81-1622). In this part of the statute, “contractor” covers the person responsible for “the installation of any component which affects the energy efficiency of the building” (81-1609(2)). If the Director of Water, Energy, and Environment or the local code authority finds within two years of first occupancy that a building did not comply, it may order the owner or prime contractor to fix it, and the owner keeps the right to sue the contractor, architect or engineer for that cost (81-1625).

Checking the installer’s state registration

An HVAC company working for you is a contractor under the Contractor Registration Act, which defines construction to include “installations” and “repairs” on real property. It must register with the Department of Labor before starting (48-2104(1)) unless it earns under $5,000 a year from construction services. The Act also excludes people working on their own property and the state and its political subdivisions (48-2104(1), 48-2116). The Department of Labor’s contractor search shows who is currently registered.

Federal heat pump and geothermal credits ended with 2025

Pub. L. 119-21, signed July 4, 2025, closed two federal credits. The home-improvement credit in §25C of the tax code now reads, at subsection (i), that the section “shall not apply with respect to any property placed in service after December 31, 2025.” Section 25D, the clean-energy credit that included geothermal heat pump property, is keyed to spending instead: it “shall not apply with respect to any expenditures made after December 31, 2025.” So equipment placed in service after 2025 earns no §25C credit, and money spent after 2025 earns no §25D credit.

Nebraska HVAC questions

I’m putting a heat pump in my unheated garage. Does the Energy Code apply?

It can. An increase in a building’s “conditioned floor area, or conditioned volume” is an addition under 81-1609(7), and the code covers additions begun on or after July 1, 2020, unless an 81-1615 exemption applies.

Can the code office inspect the finished install?

Yes, with consent. The Department of Water, Energy, and Environment and any local code authority may inspect for compliance, but only after the owner or occupant grants permission or a warrant is issued (81-1617).

Is there still a federal tax credit for a new furnace or heat pump?

Not for equipment placed in service in 2026; §25C ended for property placed in service after December 31, 2025.